And the end of the work day (ha!) we had the first set of cabinets placed.
I’ve still got to relocate the electrical outlet in the middle section. Mr. Soon needs to install the rangehood and ductwork, but apart from trim this batch is done.
Tomorrow we install the lower cabinets and counter top. That should be fun.
Technorati Tags: Blog, Construction, Remodelling